Niger Project

AREVA, the global leading nuclear power industry, was building the Niger carbon-less nuclear power station. With high standards on safety, security, transparency and ethics, AREVA is also dedicated to its expertise and responsible continuously improvement. Ranked first in the global nuclear power industry, AREVA’ s unique integrated offering to utilities covers every stage of the fuel cycle, nuclear reactor design and construction, and related services. The group is also expanding in renewable energies -wind, solar, Bio-energies hydrogen and storage – to be one of the top three in this sector worldwide in 2012.

With these two major offers. AREVA’ S 48.000 employees are helping to supply ever safer, cleaner and more economical energy to the greatest number of people.

ARK was the supplier of camp accommodation facilities for AREVA, in which we have supplied accommodation units, catering combined units, laundries, recreation units as one-stop modular solution for the 5000 square meters camp construction. All wirings were running axposedly, which made the wall panels system more flexible. Regarding the construction and operations, all the units were done strictly in accordance with global and local standards, in which way ARK’s own staff benefited greatly from this project.

By the way, ARK units are satisfyingly in compliance with AREVA’S concept of being safer, cleaner and sustainable.

Similar projects

TOP