Netcare Milpark Hospital

This project was built by Speedspace, who is Solo Agent of Ark in SA. This Project is a small hospital in South Africa.

Casting of foundations started 6 November 2013,Precision laser levelling was used to level castings for the unit.

This truck contains x8 Flat Pack Units. Before erecting the units they are the size of two containers.

A total of x40 Flat Packs was used to create a 600m2 double story unit
Floor preparation done for vinyl Flooring
• Glass panels installed to create an open view
• Electrical and additional services installed before panels can be closed up
Trenching for drainage and sewerage
• Full sluice installed
• Full RO loop and drainage installed
Nurse stations for each of the x3 sections
• Unit Managers office
• Staff Kitchen area

Ground Floor 300㎡– National Renal Care
x18 General Renal Seat areas
x2 Isolation Cubicles
Reception Area
Staff Tea Room
Medication Store
General Store
Unit Managers Office
Toilets
Sluice
Fully integrated RO Plant
Nurse Call and TV system
Fire Evacuation and Smoke Detection
Fresh Air Unit

Similar projects

TOP