570 ㎡
63 Person
East of Jiangsu Province
Construction
Ark designed and constructed this project for Bosch China. The building started in Sep 2020 and handed over in Dec 2020, included different office facility for 63 staffs.
Totally 38 x 20ft cabins have been supplied, they were combined together by Ark system with well insulation and water proofing.
As required by the client, the internal & external finishing need to be similar with traditional decoration, so metal cladding has been used to get a nice exterior looks, also plaster board wall and PVC vinyl were used to get a warm feeling.
Glass panels were used as a whole wall to get more lights inside.
Above all, Ark has a nice solution and flexible design for different office facilities, we can use same products.
Construction
- Abu Dhabi, UAE
Construction
- Colombia
Construction
- Hong Kong
Construction
- Johannesburg, South Africa
Construction
- Argentina
Construction
- Waregem, Belgium
Construction
- Port Moresby PNG
Construction
- Barranquilla
Construction
- Dingxi, Gansu Province, China
Construction
- Tema Ghana
Construction
- Yakeshi Hulun Buir, Inner Mongolia
Construction
- Yakeshi Hulun Buir, Inner Mongolia