Ark designed and constructed this project for Bosch China. The first stage started in Sep 2018 and handed over in Nov 2018, the second stage started in Sep 2019 and handed over in Nov 2019, included 10 Charging Boxes and 15 storage room.
Totally 30 x 20ft cabins and 30 x 16ft cabins has been supplied, they were combined together by Ark system with well insulation.
This project located in Inner Mongolia, where the temperature dropped to -50℃ so it have high requirements on the insulation of the whole building, 100mm mineral wool insulation as well as high quality heating system were used to get a high R value to keep the indoor temperature always above 10℃.
Ark supplied 10 sets of Charging Boxes, as there will be testing for electrical cars in the extreme cold conditions, so 3 x 16ft cabins were combined together with a auto-controlled lifting door and charging system.
Above all, Ark has a professional solution for extreme cold areas, and flexible design for different facilities, we can use same products forstorage facilities and charging boxes etc.
Construction
- Abu Dhabi, UAE
Construction
- Colombia
Construction
- Hong Kong
Construction
- Johannesburg, South Africa
Construction
- Argentina
Construction
- Waregem, Belgium
Construction
- Port Moresby PNG
Construction
- Barranquilla
Construction
- Dingxi, Gansu Province, China
Construction
- Tema Ghana
Construction
- Yakeshi Hulun Buir, Inner Mongolia
Construction
- East of Jiangsu Province